Major Work Done So Far: Tore off vinyl top Tore Interior out Replaced trunk floors and both 1/4 panels Replaced Fenders Replaced torque boxes and floor pans Sanded off all original paint and primer Sandblasted the engine-bay Rebuilt the C4 transmission Rebuilt 289 Rebuilt 8" rear-end from a 68 Mustang New suspension all around Bodywork and Paint Engine and Transmission install Battery relocated Headliner installed Windows installed/Weatherstripping finished Engine broke-in
|